07/05/2020
Volmarstein bridge traffice guidance
Today, the Volmarstein bridge, Germany, project was approved for the so-called 6+0 traffic routing on the first completed superstructure.
Contrary to the original tender, this means that it is already possible in this construction phase to provide 3 lanes in each direction of travel. This means that an optimised traffic flow can now be achieved on this highly congested section of the A1 motorway even during the construction phase.
The demolition of the second existing bridge and the new construction of the 2nd superstructure will start in May.