Start of construction
2019
End of construction
2020
Project total value
1.7 million €
Geology
River gravel, boulder clay and till in the upper layer.
Mudstone, marlstone and sandstone in the lower layers.
Technical Data
Ground Engineering works including the following activities:
• Build up a soldier pile wall
Wall-infill with shotcrete and timber 201 lm
• Construction of a bored pile wall
with 18 bored piles
Length: 11 m
Diameter: 0.64 m
• Foundation piles
Amount: 142 pieces
Diameter: 120 cm
Total length: ca. 2,360 stgm
Single length from 10 m up to 22 m
• Deconstruction works
Further project related information
• Operating works with large-scale facilities in steep slope
• Drilling in hard rocks at lower altitudes
• Drilling with water load including dispose of the drilling material