HEPP Tauernmoos
Exploratory Gallery
Client
ÖBB Infrastruktur AG
GB Energie
Contractor
BeMo Tunnelling GmbH
Project location
Tauernmoos, Stubachtal, 5723 Uttendorf, Land Salzburg
Start of construction
2013
End of construction
2014
Project total value
3 million €
Geology
Granite
Technical Data
Construction site entry on 2.037m above sea level
Length: 804m
Cross section: 37,26m² resp. 42,41m²
Downward drift: 12%
Protection: 10cm shotcrete with plastic fibres, anchoring if necessary
Ingress of water: 6-7ltr/sec
Excavation: drill & blast
Further project related information
Construction site exposed within high alpine surrounding (2.037m above sea level)