HEPP Tauernmoos

Exploratory Gallery

Client

ÖBB Infrastruktur AG
GB Energie

Contractor

BeMo Tunnelling GmbH

Project location

Tauernmoos, Stubachtal, 5723 Uttendorf, Land Salzburg

Start of construction

2013

End of construction

2014

Project total value

3 million €

Geology

Granite

Technical Data

Construction site entry on 2.037m above sea level
Length: 804m
Cross section: 37,26m² resp. 42,41m²
Downward drift: 12%
Protection: 10cm shotcrete with plastic fibres, anchoring if necessary
Ingress of water: 6-7ltr/sec
Excavation: drill & blast

Further project related information

Construction site exposed within high alpine surrounding (2.037m above sea level)