Ladle Furnance, Plant Beeckerwerth

Client

thyssenkrupp Steel Europe AG
Duisburg
Germany

Contractor

BeMo Tunnelling GmbH, NL West
Civil Engineering, Industrial and Steel Construction Dortmund

Project location

Werk Beeckerwerth
Stahlwerk OX2 Hoffsche Straße
47139 Duisburg
Germany

Start of construction

2017

End of construction

2017

Project total value

not specified

Geology

Filling consisting of bottom ash and dump material, blended with gravelly sand

Technical Data

construction works ladle furnace with dedusting, water management and
110-KV power supply:
ladle furnace:
• comprehensive foundation- and concrete work in a manufacturing
hall that works in full operation process (liquid steel)
• bored piles Ø 1.50 m and 1.80 m upright and inclined
• underpinning works, conventional
• shell inside a manufacturing hall, up to 17 m height
dedusting:
• piled foundations Ø 1.50 m
• chimney fundation and pedestal tower (contract to plant constructor)
up to 20 m high
• foundation for the dust-extraction system
water management:
• cell cooling tower in a building pit (7 m deep, up to 10 m above ground)
• uppstreamed pump cellar
• cooling tower walls with CEM-drain on the inside
• earth works for cooling water pipes and infrastructure
110-KV power line:
• ground-floor switching station building with 8 m tall walls
• 600 m cable route for a 110- KV high-voltage cable