Logistics-Center Castrop-Rauxel
new construction of a Logistics-Center in Castrop-Rauxel
Client
Deutsche Post AG / DHL Group
vertreten durch Corporate Real Estate Management GmbH
Fritz-Erler-Straße 5
53113 Bonn
Germany
Contractor
BeMo Tunnelling GmbH, , NL West
Civil Engineering, Industrial and Steel Construction Dortmund
Project location
Deininghauser Weg
44577 Castrop-Rauxel
Germany
Start of construction
2021
End of construction
2022
Project total value
not specified
Geology
Slag heap on Marl
(bulk material heap, if applicable chemical contaminated)
Technical Data
New construction of a DHL-Delivery Base in Castrop-Rauxel.
The contract includes turn-key construction of a logistics hall with a total floor area of approx. 1,680 m².
The order also comprises:
• Construction of the outside facilities ca. 6,300 m²
• Construction of roofed places/ canopies ca. 620 m²
(51 parking lots for delivery vehicles)
• Construction of social areas ca. 260 m²
• Transformer Station ca. 400 kVA
• Pphotovoltaic system ca. 75 kVA
• Concrete core activation and floor heating system
by air-to-air heatpumps
Further project related information
• Temporary blocked construction site before the planned beginning due
to the existence of numerous valuable animals
• Start of construction was delayed (absent building permission)