Münster Arcades

Injection works

Client

Aachener Grundvermögen Kapitalverwaltungsgesellschaft mbH
Oppenheimer Straße 9
50668 Köln
Germany

Contractor

BeMo Tunnelling GmbH, Niederlassung West

Project location

48143 Münster
Germany

Start of construction

2018

End of construction

2018

Project total value

0.02 million €

Task

A lot of moisture damages in some wall surfaces between wall and floor in the underground car park of the shopping mall MÜNSTER ARKADEN would be to repair by waterproofing injections.
The damaged area war situated close to the entry and exit lane of the underground car park.
Black ice on the lanes has been one of the biggest problems caused by the effects of moisture during wintertime.

Technical Data

• Installation of packers
100 pieces
DN 13 x 450
• Injection with polyurethane resin 120 litre
using a 1 component-injection pump

Further project related information

All works were done during full service and traffic in the highly frequented car park (inner-city location).