Recreation Tunnel Hasselborn
Client
HLB Basis AG für
Verkehrsverband Hochtaunus- VHT
Contractor
BeMo Tunnelling GmbH, Niederlassung West
Project location
Tunnel Hasselborn, Grävenwiesbach, Germany
Start of construction
2016
End of construction
2016
Project total value
3.3 million €
Geology
Existing tunnel build in brickwork, quarry stone wall
Technical Data
• Single-rail track, non-electrical, route 3746
Originally built from 1910 to 1912
Tunnel length: 1,310 m
Cross-sectional area: ~26 m²
• Carrying out stabilization grouting to allow safe removal of original inner blockwork lining (25-30 cm)
• Cyclic installation of sprayed concrete lining and sheeted membrane
• Renovation of selected tunnel sections
• All works carried out from tracks
• Renovation of tunnel portal
Further project related information
Aquifer specially protected by law (Area of protection, German: „Wasserschutzgebiet 2”)