Watergate Brunsbuettel
Client
Wasser und Schifffahrtsamt Brunsbüttel (WSA)
Contractor
BeMo Tunnelling GmbH, Niederlassung West
w+s bauinstandsetzung gmbh
Project location
Watergate Brunsbüttel near the North-Baltic Sea Canal (WSA),
Brunsbüttel, Schleswig Holstein
Germany
Start of construction
2012
End of construction
2014
Project total value
9.5 million €
Technical Data
The Sliding gates at watergate Brunsbüttel are installed on a rail system. During the restoration works one of the main points was to restructure this rail system so that they can remain working until the next big restoration of the watergate.
Further project related information
• parts of the works where done by divers under extremly bad visibility constitions
• installation of special concrete UHPC
• development of a special drilling method for under water use