Wind Farm Rehborn
Sealing Works
Client
GE Wind Energy GmbH
Bolanden, SA West, Ziegelhütte 1
67292 Kirchheimbolanden
Germany
Contractor
BeMo Tunnelling GmbH, Niederlassung West
Project location
55592 Rehborn
Germany
Start of construction
2018
End of construction
2018
Project total value
0.013 million €
Task
In the basement of a wind energy plant (Wind Farm Rehborn) there were some moisture damages detected at the connection joints between floor and wall, which had to be removed by sealing works under use of injections with polyurethane resin.
Technical Data
• Installation of packers
250 pieces, DN 13 x 120
• Injection of polyurethane-resin 300 l
by 1 C-Injection Pump
(1 Component-Injection Pump)
in two phases with resins of different viscosity
Further project related information
• Wind Farm Rehborn (14 plants)
• Hybrid construction