Wind Farm Rehborn

Sealing Works

Client

GE Wind Energy GmbH
Bolanden, SA West, Ziegelhütte 1
67292 Kirchheimbolanden
Germany

Contractor

BeMo Tunnelling GmbH, Niederlassung West

Project location

55592 Rehborn
Germany

Start of construction

2018

End of construction

2018

Project total value

0.013 million €

Task

In the basement of a wind energy plant (Wind Farm Rehborn) there were some moisture damages detected at the connection joints between floor and wall, which had to be removed by sealing works under use of injections with polyurethane resin.

Technical Data

• Installation of packers
250 pieces, DN 13 x 120
• Injection of polyurethane-resin 300 l
by 1 C-Injection Pump
(1 Component-Injection Pump)
in two phases with resins of different viscosity

Further project related information

• Wind Farm Rehborn (14 plants)
• Hybrid construction

Accept